Wednesday, 4 February 2015

Oli's Schedule

Three weeks in and so far, I've felt my projects have been placed on the backburner upon introducing myself to structure, in regards to always reminded and provided with a structure rather than establishing the structure on my own terms. It's something new that needs that I need to teach myself before understanding how I can go on with the next 6 months. 

After discussing with my coach and mentor, I have thought heavily on how I can create my own opportunties and sway away from the 'schoolboy' attidude of having the structure of a syllabus laid out in front of me like I've had for the past 15 years. It's now only been a year since I've left school feeling at the time like I could do everything since the world hosts a whole world in it's self of opportunity, and yet, the word everything feels so daunting to me that I eventually do nothing. 

The ideas were already set for me long before this update, it was just a matter of using the time effectively into a permanent schedule that was written down for a purpose to stay permanent and become regular for me. Currently, written below has been of use especially considering I can include projects into this schedule by simply editing this post every once in a while.

Distribution of flyers/posters: Going around town handing out flyers and placing in in public spaces, shops etc. Collectively, they promote the work space at the Welshmill Hub, 'The Cave' venue and the Edventure course for the next group of apprentices.

Blog: Emailing participants to send their updates in, updating myself, placing articles I've written in posts as way of sharing work, work with Alexis and Andy.

Press release: Talking to Neil who's also responsible for press release, working at the Hub on writing drafts for Neil; checking in with edits with him.
* = searching for jobs/ Finding out oddjobs through talking to people.

No comments:

Post a Comment